A Permian Basin operator abandoned two frac stages due to high injectivity issues, placing less than 10% of design prop volume. Implementing Corva’s GeoCompletions solution, they were able to identify impacts of well placement on fracture performance and adjusted cluster design, reduced proppant volume, and executed new design at lower pressures to improve performance.
Predictive Drilling
Drilling
Drilling