Discover how a Haynesville operator leveraged Corva’s Completions solution to uncover hidden inefficiencies and drive significant cost savings. Despite diligently tracking 65 hours of Non-Productive Time (NPT), the operator was unaware of an additional 40 hours of invisible NPT impacting productivity. With Corva’s automated time-stamping and comprehensive time allocation insights, they identified and addressed these inefficiencies with precision.
Download the full case study to learn how Corva helped this operator uncover nearly 105 hours of NPT, with the potential to reduce annual costs by up to $1.7 million per crew.
Completions
Uncover how an Anadarko Basin operator discovered 7.7 hours of unreported NPT using Corva. Read our case study.
Completions
Learn how Corva's GeoCompletions software improved completions efficiency and saved $1.8M in the Permian Basin.
Completions
Discover how Corva & NexTier optimized wellsite efficiency, reducing fuel costs and CO2e emissions in dual-fuel frac fleets.