Optimized Lower Completions Needed to Mitigate Risks and Maximize Production
A major IOC needed real-time optimization of lower completions runs to mitigate risks to ensure maximum production recoveries.
Key Results & Value Delivered
- Reduced Risk: Mitigated premature packer setting and formation damage
- Enhanced Efficiency: Smooth, uninterrupted lower completions runs
- Maximized Production: Unlocked optimal well production performance