Deepwater Operator Gains $58MM in Revenue with Optimized Conventional Lower Completions Runs

Optimized Lower Completions Needed to Mitigate Risks and Maximize Production

A major IOC needed real-time optimization of lower completions runs to mitigate risks to ensure maximum production recoveries.

Key Results & Value Delivered

  • Reduced Risk: Mitigated premature packer setting and formation damage
  • Enhanced Efficiency: Smooth, uninterrupted lower completions runs
  • Maximized Production: Unlocked optimal well production performance